top of page
Safety Wear

CDM Risk Assessment

The requirements of the new CDM Regulations published in 2015 moved the responsibility for the pre-contract H&S pack from the Main Contractor to the Client or his Principle Designer.works with up-to-date quotations and insights from Apogee's experienced and knowledgeable consultancy team.

white-version-160x160px.png
What is a Construction (Design and Management) Risk Assessment?

Taking the the utility plant search results and comparing them with the client’ s scheme drawings, this report delivers a full analysis of risk and a set of recommended actions to minimise on site Health & safety risk. This enables the client to determine what actions are required to ensure HSG47, PAS 128 and CDM regulation compliance.

 

This report delivers a Risk Classification, ALARP assessment, severity and likelihood designations. The result is a report that takes the client through the process in accordance with HSG47 and PAS 128 enabling competitive tendering for further site investigations either before or after the pre contract Health & Safety pack.

Who is the Construction Design and Management (CDM) Risk Assessment suitable for?

Solicitors, Clients, Designers and Project Managers. Developers, Local Authorities Consultants, Architects, Design & Build Contractors, Contractors, Highways scheme promoters, Surveyors and Health & Safety consultants.

bottom of page